| Home | > | Empennage | > | Elevators |
| << Previous | Page 9-5 (1 1/4 hours) | Next >> |
Steps 1 & 2. Now the bridge structure begins to take shape. Cleco the E-1008 rib assemblies to the E-1002 front spars and bottom skins. I had marked the ribs from A to P, so I started with A and went alphabetical. The only reason to do this is to feel confident that you can get them back in the same order if your markings are washed away. Cleco the E-905 root ribs into place, as well. When this is done, cleco the E-1007 rear spars into place (that is, onto each of the ribs and the bottom skin). 12/26/06 - 35 minutes total |
|
Step 4. As shown, cleco an E-1022 to the E-1007 rear spar. This shear clip eventually attaches to the tabs you bent earlier, so make sure that it is positioned as shown. 12/27/06 - 10 minutes |
| << Previous | Page 9-5 | Next >> |
| | | 9-2 | | | 9-3 | | | 9-4 | | | 9-5 | | | 9-6 | | | 9-7 | | | 9-8 | | | 9-9 | | | 9-10 | | | 9-11 | | | 9-12 | | |
| | | 9-13 | | | 9-14 | | | 9-15 | | | 9-16 | | | 9-17 | | | 9-18 | | | 9-19 | | |
| © 2006 Pider-Air |
| Send comments or corrections to the guy in the top left corner |
| jjessen at rcn dot com |


