| Home | > | Empennage | > | Elevators |
| << Previous | Page 9-15 (7 hours) | Next >> |
Step 2. Rivet the shear clip to the close out tabs. Put a rivet in those two rivets and one in the hole that stands alone. Use the CS4-4 blind rivets. 04/07/07 - 15 minutes |
|
Step 7. Skipped for now. I'll finish this when assembling. |
Step 9. Attach the weights as shown in the plans. 04/08/07 - 30 minutes |
|
| << Previous | Page 9-15 | Next >> |
| | | 9-2 | | | 9-3 | | | 9-4 | | | 9-5 | | | 9-6 | | | 9-7 | | | 9-8 | | | 9-9 | | | 9-10 | | | 9-11 | | | 9-12 | | |
| | | 9-13 | | | 9-14 | | | 9-15 | | | 9-16 | | | 9-17 | | | 9-18 | | | 9-19 | | |
| © 2006 Pider-Air |
| Send comments or corrections to the guy in the top left corner |
| jjessen at rcn dot com |









