| Home | > | Empennage | > | VS |
| << Previous | Page 6-4 (11 1/2 hours) | Next >> |
Step 1. Okay, here come the mistakes. Watch out as you examine the pictures here and for the rest of the build. Make sure you are seeing what you think you're seeing. I'll explain more below. Cleco the VS-1015 front spar doubler to the aft side of the VS-1002 front spar and final drill the holes indicated using a #30. Remove the doubler and deburr the holes. 05/26/05 - 45 minutes |
Steps 3 & 4. Separate the rudder stop pieces and clean them up. Cleco the stops to the upper of the two VS-1010 hinge brackets and final drill the holes with a #30, remove the stops and deburr. The instructions clearly state at this point, "Be careful to cleco the rudder stops as shown, the hole pattern will allow them to be clecoed in reverse." Note how beautifully correct they are in the picture. Not for long! 05/26/05 - 45 minutes |
Step 5. Prime all the parts of the VS in preparation for final riveting and scuff the hinge brackets. 07/09/05 - 6 hours |
Step 7. Reassemble the rear spar, taping shut those holes that are called out not to be riveting. Make sure the rear spar doubler is facing the right way and have at it. Rivet away. 07/12/05 - 2 hours |
| << Previous | Page 6-4 | Next >> |
| | | 6-2 | | | 6-3 | | | 6-4 | | | 6-5 | | | 6-6 | | |
| © 2006 Pider-Air |
| Send comments or corrections to the guy in the top left corner |
| jjessen at rcn dot com |





